Internal/External Inspection of Cylinders

SKU:

Cylinders due for inspection and testing are identified from the date of manufacture, or from the date of the last periodic test, stamped on the cylinder. The markings on each cylinder shall be checked for compliance with statutory and other requirements like manufacturing specification. The cylinders shall be weighed to check between the actual and stamped tare of the cylinders for cylinders which have their valves contents removed.

The equipment and procedures for internal and external inspection of cylinders are carried out at CMS complying to the flowing standards:

  •  Singapore Standards CP 12-1 Code of practice for the filling, inspection, testing and maintenance of containers for the storage and transport of compressed gases – Seamless metal containers for gases, excluding dissolved acetylene
  • AIGA 090 A reference guide for requalification of gas cylinders
  • ISO 13769 Gas cylinders – Stamp marking

Loading...

Description

Cylinders due for inspection and testing are identified from the date of manufacture, or from the date of the last periodic test, stamped on the cylinder. The markings on each cylinder shall be checked for compliance with statutory and other requirements like manufacturing specification. The cylinders shall be weighed to check between the actual and stamped tare of the cylinders for cylinders which have their valves contents removed.

The equipment and procedures for internal and external inspection of cylinders are carried out at CMS complying to the flowing standards:

  •  Singapore Standards CP 12-1 Code of practice for the filling, inspection, testing and maintenance of containers for the storage and transport of compressed gases – Seamless metal containers for gases, excluding dissolved acetylene
  • AIGA 090 A reference guide for requalification of gas cylinders
  • ISO 13769 Gas cylinders – Stamp marking

Related Product

Service Packages
Internal cleaning of cylinders
Sandblasting of cylinders and packs
Repair of Frames (main structure for DNV 2.7-1...
Manifold Testing
Lifting inspection during refurbishment of packs
Storage of cylinders DG and flammable cylinders –...
Refurbishment of packs
Assembly of packs

Preferred

Popular

Ultrasonic Examination of Cylinders (UE)
Painting of cylinders
Change of valves (valving and de-valving)